The purity of this bridge's design is reflected in the way CDCL has reduced to the minimum the materials employed. This bridge is an amazing technical feat. Equipped with a lift, to allow easy access not only for people with reduced mobility but also families with buggies, it is primarily built of steel. The complex implementation required unparalleled expertise to meet the various challenges imposed by the site's location:
- An altitude difference of approximately 21 m
- A distance of 108 m
- Level access to the Gaalgebierg hill
- Implantation under high-voltage lines but above the overhead power lines.